Property Spoon Drain- January 2011
With the amount of rain in South East Queensland, this client had a lot of water flowing over his property and into his neighbours. He wanted it captured and redirected to his dam mid last year. With the heavy rains his water tanks started to overflow causing problems for his drive way and turning bay. We put another spoon drain in to lead the water to the main drain, reducing the water coverage on his driveway area. The pitch of the drain had to be slight to allow his mower to pass over the edge and into the drains bottom when mowing.

Main Spoon Drain

Main Spoon Drain

Spoon Drain from Water Tanks

Spoon drain from water tanks leading to main spoon drain

Spoon Drains Intersection

Spoon Drains Intersection

















Pacific Pines- Pittcairn Way August 2009
This gated townhouse complex involved the construction of a ring road. The Contractor, Jim Harkin of Harkin Earthmoving, contacted us to ensure that this project was delivered with professional results. Working amongst builders who were completing the townhouses at the same time, both Jim Harkin and our operator Ron Foley both had to be extremely aware of safety while completing this project.

Pacific Pines- Entry to Ring Road

Pacific Pines- Entry to Ring Road

Pacific Pines- Final Trim

Pacifi Pines- Final Trim

Pacific Pines- Note not articulated for corner

Pacific Pines- Note articulation not used for corner


















The Gap January 2009

Clearing of over growth to be stripped back and levelled for slashing. Foley’s Earthmoving won the tender due to our experience, being the siteĀ is a cement dump and there is only 300mm of top soil covering this.

Start of The Gap

Start of The Gap

The Gap

The Gap

Final Result at The Gap

Finished Result at The Gap