Project: Gas Pipeline, Facility and Fields.
Location: Darling Downs and Granite Belt, Qld (Dalby, Tara and Chinchilla Area, Qld)
Commencement Date: Late 2011
Finish Date: estimated Mid to Late 2013
Project Owner: TBA
Head Contractor: TBA

Only Subcontractors registered with Foley’s Earthmoving requested to Quote.

This major project is estimated to take between 18 months to 2 years to complete and is scheduled to start late 2011. Below is a list of equipment initialy requested for quote. Local subcontractors preferred but not required.

  • Articulated Dump Trucks: 35t
  • Articulated Dump Trucks: 40t
  • 623 Elevating Scraper
  • 631 Scraper
  • Towed Scrapers: 20t
  • Towed Scrapers: 30t
  • Dozers: D6
  • Dozers: D7
  • Dozers: D8
  • Dozers: D10
  • Compactors: C825
  • Compactors: 615
  • Water Carts: 10kl
  • Water Carts: 20kl
  • Water Carts: 45kl
  • Excavators: 20t
  • Excavators: 30t
  • Excavators: 45t (345ME) – Lge Bucket
  • Excavators: 20t (rubber tyred)
  • Excavators: 30t (rubber tyred)
  • Excavators: 45t (rubber tyred)
  • Graders: 14H
  • Graders: 16H
  • Loaders: 928s
  • Loaders: 966s
  • Loaders: 980s
  • Backhoes
  • Bobcats [wheel]
  • Bobcats [track]
  • Pad Foot Rollers, 15t
  • Body Trucks; 13t
  • Truck & Dog